How to Run a Quality Control Inspection

Apply QC plans to work orders and record pass/fail results before finished goods reach stock.

  1. Step 1. Define QC plans under Manufacturing with checkpoints and acceptable criteria for repeatable inspections.
  2. Step 2. Link the QC plan to the work order or production step as your process requires.
  3. Step 3. When production reaches the QC stage, open the inspection screen from the work order.
  4. Step 4. Record measured values and pass/fail per checkpoint.
  5. Step 5. Accept output into finished goods stock only after QC passes; reject or rework quantities stay traceable.

Tips